{"id":12978,"date":"2015-08-05T08:00:18","date_gmt":"2015-08-05T12:00:18","guid":{"rendered":"http:\/\/musicianonskis.ca\/blog\/?p=12978"},"modified":"2015-08-04T19:19:11","modified_gmt":"2015-08-04T23:19:11","slug":"august-05-2015","status":"publish","type":"post","link":"https:\/\/musicianonskis.ca\/blog\/2015\/08\/05\/august-05-2015\/","title":{"rendered":""},"content":{"rendered":"<p><a href=\"http:\/\/musicianonskis.ca\/blog\/?attachment_id=12980\" rel=\"attachment wp-att-12980\"><\/a><a href=\"http:\/\/musicianonskis.ca\/blog\/?attachment_id=12979\" rel=\"attachment wp-att-12979\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-12979\" src=\"http:\/\/musicianonskis.ca\/blog\/wp-content\/uploads\/2015\/08\/150804_IMG_0673-2-2.jpg\" alt=\"150804_IMG_0673-2-2\" width=\"800\" height=\"589\" \/><\/a> <a href=\"http:\/\/musicianonskis.ca\/blog\/?attachment_id=12981\" rel=\"attachment wp-att-12981\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-12981\" src=\"http:\/\/musicianonskis.ca\/blog\/wp-content\/uploads\/2015\/08\/150804_IMG_0696-2-2.jpg\" alt=\"150804_IMG_0696-2-2\" width=\"800\" height=\"596\" \/><\/a> <a href=\"http:\/\/musicianonskis.ca\/blog\/?attachment_id=12982\" rel=\"attachment wp-att-12982\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-12982\" src=\"http:\/\/musicianonskis.ca\/blog\/wp-content\/uploads\/2015\/08\/150804_IMG_0725-2-2.jpg\" alt=\"150804_IMG_0725-2-2\" width=\"800\" height=\"517\" \/><\/a>It&#8217;s a challenge to access some of the park right now.\u00a0 With the usually most accessible trails (entire Visitor&#8217;s Center Loop while they fix the bridge) and roads (parkway from P8 to P9) closed off, and the town of Chelsea delaying the paving of Scott Road, it takes a bit more motivation to go for a\u00a0 quick ride or run.\u00a0 It&#8217;s odd that they didn&#8217;t decide to do one project at a time.\u00a0 Let&#8217;s hope things get repaired quickly.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>It&#8217;s a challenge to access some of the park right now.\u00a0 With the usually most accessible trails (entire Visitor&#8217;s Center Loop while they fix the bridge) and roads (parkway from P8 to P9) closed off, and the town of Chelsea delaying the paving of Scott Road, it takes a bit more motivation to go for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43],"tags":[1590,1591],"class_list":["post-12978","post","type-post","status-publish","format-standard","hentry","category-gatineau-park","tag-road-closures","tag-trail-closures"],"_links":{"self":[{"href":"https:\/\/musicianonskis.ca\/blog\/wp-json\/wp\/v2\/posts\/12978","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/musicianonskis.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/musicianonskis.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/musicianonskis.ca\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/musicianonskis.ca\/blog\/wp-json\/wp\/v2\/comments?post=12978"}],"version-history":[{"count":1,"href":"https:\/\/musicianonskis.ca\/blog\/wp-json\/wp\/v2\/posts\/12978\/revisions"}],"predecessor-version":[{"id":12983,"href":"https:\/\/musicianonskis.ca\/blog\/wp-json\/wp\/v2\/posts\/12978\/revisions\/12983"}],"wp:attachment":[{"href":"https:\/\/musicianonskis.ca\/blog\/wp-json\/wp\/v2\/media?parent=12978"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/musicianonskis.ca\/blog\/wp-json\/wp\/v2\/categories?post=12978"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/musicianonskis.ca\/blog\/wp-json\/wp\/v2\/tags?post=12978"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}